Case story

Upgrade of synthesis production in synthesis factory F2 with a new source

Project at Lundbeck A/S Lumsås where the existing process plant in synthesis factory F2 was upgraded with a new type of mixing source to supply one of the existing reactors in the synthesis hall. In connection with the upgrade the new source had to be provided with panels for managing valves and general handling.

Tank in a Process Plant at Lundbeck

Competencies

Steering group
Project management
Project/design engineer
Specialist competencies
Drawing resources

Project phases

Feasibility study
Conceptual design
Basic design
Detailed design
Installation
Commissioning & handover

The process

Lundbeck was responsible for the overall project management, HAZOP, mechanical installation of components and qualification of the new process equipment. Process Engineering reported to the project manager from Lundbeck and provided consulting services in process, electricity/SRO relating to the process plant, electricity supply and CE marking. We also prepared an ATEX report for the entire installation, and a combined panel with a valve, a pump and a mixer to manage the source and reactor was installed.

In order to streamline the process, and in partnership with Lundbeck, we focused on how the tests performed during qualification could be integrated in the CE marking.

Service and scope of the project

Do you have a project for which you need strong engineering skills?

Contact us and learn how we can assist you as your consulting engineering partner

Poul B. Jakobsen
Contact me for more information
Poul B. Jakobsen
CEO

Book et møde