Replacement of an NH3 refrigeration plant with a central glycol refrigeration system

Competencies

Steering group
Project management
Project/design engineer
Specialist competencies
Drawing resources

Project phases

Feasibility study
Conceptual design
Basic design
Detailed design
Installation
Commissioning & handover
Contact me for more information
Martin Stubkjær
Head of department, Fredericia
Phone: +45 6011 2173

Project description

The assignment was to replace an existing NH3 refrigeration plant with a new, central glycol refrigeration system. The new system was to be put into operation while the system was still supplying production with cooling.

In addition, there was a desire to cover a single production with a decentralised NH3 refrigeration plant with a lower temperature than the glycol refrigeration system can handle. This was to be installed in a separate engine room with mechanical ventilation.

The process

Process Engineering’s project manager handled the project economy, the scope of delivery, the time schedule, purchasing, reception of goods, inspection, test, control, safety coordination, documentation, CE marking and coordination of environmental issues.

The project was separated into the areas process, electricity and automation, civil/building, process equipment and the environment.

The project manager from process Engineering reported to the customer’s key people.

Udskiftning af NH3-køleanlæg med centralt glykol-køleanlæg

Service and scope of the project

Our service and the scope of the project include:

  • Project management
  • Process flow diagram
  • Mass balance
  • PI diagram
  • Inventories
  • Process description
  • ATEX zones
  • Machine plan
  • Tender material and requirements specification
  • Purchasing and reception of goods
  • Inspection, test and control of equipment
  • Installation tender
  • Safety coordination
  • Assembly management