Case story

Plant for pulverisation and separation of steel scrap

In order to meet recent legislation on reduction of waste deposit from steel scrap, Stena Metal Recycling A/S was to put into operation a plant based on completely new pulverisation principles at their facility at the Port of Grenaa before the end of 2017. The plant included several powder management and separation processes connected by approximately 40 conveyor belts, elevators, etc.

Processing plant at Stena Recycling for pulverisation and separation

Competencies

Steering group
Project management
Project/design engineer
Specialist competencies
Drawing resources

Project phases

Feasibility study
Conceptual design
Basic design
Detailed design
Installation
Commissioning & handover

The process

The project was based mainly on a number of procurements based on operational needs concerning a basic engineering package while construction and calculation of the steel structure were performed as detailed engineering by Process Engineering.

Process Engineering’s project manager and specialists mainly worked from the project office in Copenhagen. However, in connection with the preparation of the tender materials and screening of suppliers the project manager moved his office to Stena Metal Recycling’s office.

While the project was implemented, we adjusted our project organisation to include two to seven people depending on the need for various competencies.

Service and scope of the project

Do you have a project for which you need strong engineering skills?

Contact us and learn how we can assist you as your consulting engineering partner

Poul B. Jakobsen
Contact me for more information
Poul B. Jakobsen
CEO

Book et møde