Case story
New steam boiler plant
On the basis of material prepared by the customer, Process Engineering was responsible for complete engineering of a new steam boiler plant.
Competencies
Project phases
The process
On the basis of drawings of existing buildings and a new building for the steam boiler, including all equipment, we prepared component and plant specifications, drawings and calculations relating to a piping system in accordance with PED, supporting constructions, a pipe bridge and placement of this, inventories and component lists plus capacity calculations of the plant.
We had a close dialogue with the customer and the customer’s sub-suppliers through the project in order to ensure that the right solution was found and to ensure that the statutory documentation was provided by the suppliers.
Service and scope of the project
- A complete model of the entire plant
- Inventories
- Working drawings for workshop
- Documentation reports about the piping system in accordance with EN13480