Case story

New steam boiler plant

On the basis of material prepared by the customer, Process Engineering was responsible for complete engineering of a new steam boiler plant.

Steam boiler plant

Competencies

Steering group
Project management
Project/design engineer
Specialist competencies
Drawing resources

Project phases

Feasibility study
Conceptual design
Basic design
Detailed design
Installation
Commissioning & handover

The process

On the basis of drawings of existing buildings and a new building for the steam boiler, including all equipment, we prepared component and plant specifications, drawings and calculations relating to a piping system in accordance with PED, supporting constructions, a pipe bridge and placement of this, inventories and component lists plus capacity calculations of the plant.

We had a close dialogue with the customer and the customer’s sub-suppliers through the project in order to ensure that the right solution was found and to ensure that the statutory documentation was provided by the suppliers.

Installation in steam boiler plant

Service and scope of the project

Do you have a project for which you need strong engineering skills?

Contact us and learn how we can assist you as your consulting engineering partner

Poul B. Jakobsen
Contact me for more information
Poul B. Jakobsen
CEO

Book et møde