Case story

Installation of heat exchangers in pipe system to utilize energy source

In 2017, the former refinery burned down to the ground, and Process Engineering was consultant in the reconstruction of the new and significantly larger refinery, which today stands on the harbor in Kalundborg. In a part of the process in the new refinery, AVG wanted to utilize the surplus energy to further improve the energy key figures or unit consumption

Avista Green refinery in Kalundborg

Competencies

Steering group
Project management
Project/design engineer
Specialist competencies
Drawing resources

Project phases

Feasibility study
Conceptual design
Basic design
Detailed design
Installation
Commissioning & handover

The process

Existing process:

Process after modification:

This work includes a wide range of responsibilities with design, calculation and purchase. We participate in the project with an engineer, who has the overall responsibility from our side together with internal drawing and specialist resources. We solve the project from our office in Copenhagen, but are onsite in Kalundborg when it is needed.

Pipe system in Avista Green refinery in Kalundborg

Service and scope of the project

Do you have a project for which you need strong engineering skills?

Contact us and learn how we can assist you as your consulting engineering partner

Poul B. Jakobsen
Contact me for more information
Poul B. Jakobsen
CEO

Book et møde