Case story

Expansion of synthesis production at existing synthesis factory F2

Project at Lundbeck A/S Lumsås where the existing process plant in synthesis factory F2 was upgraded with a new synthesis unit consisting of a reactor source, a reactor and a condenser. In connection with the upgrade the new synthesis unit had to be supplied with panels for managing valves and general control of the sources, the reactor and the condenser.

Tank in a production facility at a pharma client, where we have worked on expanding synthesis production in the existing synthesis plant F2

Competencies

Steering group
Project management
Project/design engineer
Specialist competencies
Drawing resources

Project phases

Feasibility study
Conceptual design
Basic design
Detailed design
Installation
Commissioning & handover

The process

Lundbeck was responsible for the overall project management, HAZOP, mechanical installation of components as well as for qualification of the new process equipment. Process Engineering reported to the project manager from Lundbeck and provided consulting services on process and electricity/SRO in relation to the process plant, the electricity supply and CE marking. In addition, we prepared an ATEX report about the entire installation.

In order to streamline the process, and in partnership with Lundbeck, we focused on how the tests performed during qualification could be integrated in the CE marking.

Service and scope of the project

Do you have a project for which you need strong engineering skills?

Contact us and learn how we can assist you as your consulting engineering partner

Poul B. Jakobsen
Contact me for more information
Poul B. Jakobsen
CEO

Book et møde