Our client, specializing in detailed engineering within the pharmaceutical industry, faced challenges during the installation of a saturated steam system designed for 18 bar(g) and 210°C. The piping system was stainless steel, but standard fittings had long lead times, which risked delaying the project. To mitigate this, the client manufactured 7 extruded tees for five locations. Our role in the project was to perform a design  review of the client’s pipe stress calculation and subsequently provide a solution to the challenge.

Image of a T-piece in a 3D model

Competencies

Steering group
Project management
Project/design engineer
Specialist competencies
Drawing resources

Project phases

Feasibility study
Conceptual design
Basic design
Detailed design
Installation
Commissioning & handover

Process

The project was executed by our pipe stress engineers in close collaboration with the client.

We carried out pressure calculations for the system, and while these were acceptable, the flexibility analysis revealed that two of the tee positions exceeded utilization limits. Using a standard fitting with greater wall thickness was not an option due to lack of drainability

Therefore, we implemented stub-in tees using available pipe materials (in this case, an ASME material with a dual material certificate, eliminating the need for PMA (Particular Material Appraisal), which is required when a material is not under European standards, but must be verified for chemical consistency). To ensure structural integrity, we performed Finite Element Analysis (FEA) on the two critical positions. At the same time, we ensured quality assurance in accordance with ISO9001.

The project was completed without delays caused by fittings, and the detailed engineering met all safety and compliance requirements.

Pipe stress analysis of a high-pressure clean steam system

What is a tee?

A tee is a pipe fitting shaped like the letter “T” and is used either to branch a pipe in two directions or connect three pipelines. There are different types of tees, such as extruded, stub-in, and cast/formed tees.

Extruded tees are where the branch is formed by pressing/extruding material from the main pipe. Stub-in tees are where the branch is welded directly into the main pipe through a cut-out hole. Cast/formed tees are a fitting without welds, made from as uniform a material as possible.

Service and scope of the project

Do you have a project for which you need strong engineering skills?

Contact us and learn how we can assist you as your consulting engineering partner

Michael Hastrup Andersen
Contact me for more information
Michael Hastrup Andersen
Director, Food & Biotech Section

Book et møde