Case story
CE marking of plant at dairy
CE marking of a production line for snacks, including cheese, nuts and dried fruit.
Competencies
Steering group
Project management
Project/design engineer
Specialist competencies
Drawing resources
Project phases
Feasibility study
Conceptual design
Basic design
Detailed design
Installation
Commissioning & handover
The process
The process involved a review of the client’s technical documentation and user manuals and a safety review of interfaces between individual machines.
The action plan was prepared on the basis of the safety review. Final validation was implemented when the action plan had been completed.
Service and scope of the project
- Review of plant design
- Action plan based on safety review
- Follow-up on action plan
- Declaration of conformity
- CE labelling plate
Do you have a project for which you need strong engineering skills?
Contact us and learn how we can assist you as your consulting engineering partner
Contact me for more information
Martin Stubkjær
Head of department, Fredericia