Project Management on Skærbækværket, Biomass boiler
Site manager for installation work Managing documentation about installation Participation in safety meetings Coordination of craftsmen Supervision of execution of installation
Site manager for installation work Managing documentation about installation Participation in safety meetings Coordination of craftsmen Supervision of execution of installation
Mapping of flammable materials Identification of emission and ignition sources Review of ventilation efficiency and availability Assessment of the plant’s operating time Zone classification and description of cleaning and maintenance routines
Review of plant design Risk assessment and zone classifications of straw-fired heating plant Action plan based on the risk assessment Follow-up on the action plan
Identification and implementation of pipe specifications and components Drawing of entire process lines in 3D Design review together with the customer Extraction of isometrics for assembly and welding control As-build documentation
Stress-strain analysis based on client’s 3D model of pipe system Calculation from the design data on pressure and temperature Preparation of calculation report
Agreement with suppliers and procurement for the project Pressure loss calculation for all pipes before ordering pumps Coordination and clarification with management supplier Preparation of PI diagram and component list Update of design calculation system